Energy ManagementBuilding tier · platform

Set the rules your building runs by, then leave it.

Manual controls and inconsistent rules cause waste, equipment strain, and unpredictable expense.

Why manage energy

A saving that depends on someone remembering is not a saving.

An audit tells you what to change. Without enforcement the setpoint drifts back within a month, the out-of-hours lockout gets overridden, and the measured saving disappears without anyone deciding to give it up.

The rules are the same ones the module enforces

Schedule, setpoint floor, energy target and shed order are properties of the ACMC30 and are decided in a fixed precedence on the device itself.

See how control works
What this page adds

Verification, continuously

Consumption is measured against the audit baseline every day the building runs, not once at handover. Drift shows up as a number weeks before it shows up as a bill — which is the difference between a saving that was achieved and a saving that is still there a year later.

When supply is short, something has to go off first. Set the order and watch the peak fall.

Load Sequencer

Sample facility · commercial branch · 10 loads

Interactive demo · sample data
Priority order · drag a row to reorder · highest priority at top
01Server Room AC4.8kWRunning
02Critical zone6.2kWRunning
03Main hall AC7.2kWRunning
04Counter area AC5.4kWRunning
05Lighting Zone A3.1kWRunning
06Office 1s4.2kWRunning
07Records Room AC2.8kWRunning
08Lobby AC3.6kWRunning
09Motor / Pump5.5kWRunning
10Signage1.8kWRunning

Shed order runs bottom-up. Loads you rank highest are held to the last. Criticality is a property of the load, not its position.

Available supply
Demand 44.6
60 kW300
Served demand44.6kW
Available supply52.0kW
Headroom7.4kW
Loads shed0/ 10
Enercon control · 0 shed · 52.0 kW supply

The saving is still there a year later

Less equipment strainSequenced starts and enforced setpoints reduce short-cycling and simultaneous inrush.
Predictable expenseA consumption ceiling per period turns the energy line from a variable into a budget.